3. Supplier Tiers
Every supplier is given one of three tiers, and its tier sets how closely it is checked and how often it is reviewed.
| Tier | A supplier is in this tier where | Reviewed |
|---|---|---|
| Tier 1 | It holds or can reach customer data, it can make changes to a system that [Company] uses to serve its customers, or [Company] could not serve its customers without it | At least every 12 months |
| Tier 2 | It holds or can reach [Company]'s confidential information, beyond the names and work contact details of the staff who use its service, or it has access to [Company]'s systems or accounts | At least every 24 months |
| Tier 3 | It is any other supplier that this policy covers | Only when section 8 calls for a review |
A supplier takes the first tier in the table whose test it meets. Its tier depends on what the supplier holds, reaches and does for [Company], and not on its size, its reputation or what [Company] pays it.
The CTO, or a person the CTO has named in writing, sets the tier of each supplier before it is approved, and the tier and the reason for it go in the supplier register. A supplier may be put in a stricter tier than the table gives it, and never in a less strict one. Tier 1 is the strictest tier.
A supplier's tier is set again whenever what it holds, reaches or does for [Company] changes. Where the change moves a supplier to a stricter tier, the checks that section 6 gives the new tier are made, the agreement meets what section 7 requires for it and the supplier is approved again under section 5, before the supplier is given the information or access that moved it.
6. Checks Before Approval
The member of staff who will be a supplier's supplier owner makes the checks below. They are made before the supplier is approved, or within the 30 days for which section 5 lets a supplier be approved before they are finished. What was looked at, the day it was looked at and what was found go in the supplier register.
- For every supplier, the check confirms what the supplier will provide, what information it will hold or be able to reach and what access it will have.
- For a Tier 1 or Tier 2 supplier, the check looks at evidence of how the supplier protects the information it holds. The evidence is a report or a certificate on the supplier's security from an independent body or, where the supplier has neither, the supplier's written answers to [Company]'s questions about its security.
- Where the evidence is a report or a certificate, the check confirms that it covers the service [Company] will use, that a report covers a period that ended no more than 12 months before the check, that a certificate has not expired, and what failings it records.
- For a Tier 1 or Tier 2 supplier, the check also confirms what the supplier's terms allow it to do with [Company]'s information for its own purposes, including whether it may use that information to train AI models, and which of the supplier's own suppliers will hold or be able to reach [Company]'s information.
- For a Tier 1 supplier, the check also confirms how and how soon the supplier tells [Company] of a security incident, and what the supplier commits to on keeping its service available and on restoring it after a failure.
- For a Tier 1 supplier, the member of staff who will be its supplier owner also writes a short plan for leaving it, which says how [Company] would get its information back and how it would carry on its work if the supplier failed or [Company] stopped using it. The plan goes in the supplier register.
- It is a shortfall where a Tier 1 or Tier 2 supplier gives none of this evidence, where the evidence does not cover the service [Company] will use or is out of date, where it records a serious failing that the supplier has not put right, or where the supplier's terms allow it to use [Company]'s confidential information for its own purposes.
- Where a check finds a shortfall, the supplier is approved, or stays approved after those 30 days, only after the shortfall is put right or has an exception under section 10.
- A report, a certificate or a set of answers is evidence of how a supplier works, and does not replace the reviews that section 8 requires.
7. Agreements with Suppliers
No supplier is given [Company]'s information or access to its systems or accounts before a written agreement with it is in place. Terms that a supplier publishes and [Company] accepts are a written agreement under this policy. The agreement with a Tier 1 or Tier 2 supplier must have these six terms.
- Confidentiality: the supplier keeps [Company]'s information confidential and uses it only to provide its service to [Company].
- Security: the supplier protects [Company]'s information with security measures that fit how sensitive it is.
- Incidents: the supplier tells [Company] promptly of any security incident that affects [Company]'s information.
- Its own suppliers: the supplier passes [Company]'s information to another supplier only on terms that protect it at least as well.
- Ending: the supplier returns or deletes [Company]'s information when the agreement ends.
- Evidence: the supplier gives [Company] the information it needs to check that these terms are met.
A term that is missing from the agreement with a Tier 1 or Tier 2 supplier is a shortfall under section 9, whether or not the supplier is willing to change its terms. The supplier owner records in the supplier register where the agreement is kept, the day it ends or renews and the notice needed to end it.
Where a supplier will hold or be able to reach personal data, the agreement also has the terms that [Company]'s rules on personal data require, and the supplier is given no personal data until the agreement has been confirmed as those rules require.
Where a supplier will hold or be able to reach customer data that [Company] holds under a contract with a customer, the CTO, or a person the CTO has named in writing, makes sure before the supplier is approved that the contract allows it, that the customer has been given any notice the contract requires, and that the agreement with the supplier protects that data at least as well as the contract does.
Read the full example
[Company] Supplier Management Policy
- Version: 1.0
- Owner: CTO
- Approved by: CEO
- Effective date: [Effective date]
- Next review date: [Review date]
1. Purpose and Scope
This policy sets how [Company] chooses the suppliers it relies on, what it checks before it uses one, what its agreement with a supplier must say, how it reviews its suppliers and how it ends its use of one. It sits beneath [Company]'s information security policy.
This policy covers every supplier that holds or can reach [Company]'s information, that has access to its systems or accounts, or that [Company] relies on to serve its customers. It covers a supplier whether or not [Company] pays for it, including a free service, a service on trial and a service that one member of staff signs up to for [Company]'s work. A supplier that holds none of [Company]'s information, has no access to its systems or accounts and is not relied on to serve its customers is outside this policy.
This policy applies to everyone who is given access to [Company]'s systems, accounts or information: employees, contractors and anyone else working on its behalf. This policy calls them staff. An individual who works for [Company] as a contractor is staff under this policy and not a supplier.
- Supplier: any business or other body outside [Company] that provides it with a service or with software.
- Supplier register: the list of [Company]'s suppliers, which section 4 describes.
- Supplier owner: the member of staff named in the supplier register as responsible for [Company]'s use of a supplier.
- Tier: one of the three groups, Tier 1, Tier 2 and Tier 3, into which section 3 puts each supplier.
- Customer data: information that [Company] holds for or about its customers.
- Confidential information: anything [Company] has not made public whose release could harm [Company] or anyone it works with or for, including customer data and personal data.
- Shortfall: a requirement of this policy that a supplier, or [Company]'s agreement with it, does not meet.
2. Roles and Responsibilities
- The CTO: keeps this policy and reviews it under section 12; keeps the supplier register under section 4; makes sure each supplier is given a tier under section 3; approves suppliers under section 5 and exceptions under section 10; makes sure suppliers are checked, reviewed and, where they fall short, dealt with under sections 6 to 9; and makes the report that section 12 describes. Where this policy has a member of staff ask or tell the CTO something, they may ask or tell a person the CTO has named in writing instead.
- The CEO: approves this policy and each change to it under section 12; approves a supplier or an exception that the CTO asks for, under sections 5 and 10; gives the agreement that section 10 requires for an exception for a Tier 1 supplier; and receives the report that section 12 describes.
- Supplier owners: make the checks and reviews that sections 6 and 8 give them, keep the entries for their suppliers in the supplier register up to date, tell the CTO of the events and changes that section 8 lists, and make sure the steps in section 11 are carried out when the use of a supplier ends.
- All staff: use only suppliers that have been approved under section 5, give a supplier only the information and access that its approval covers, and tell the CTO of any supplier in use that is not on the supplier register.
3. Supplier Tiers
Every supplier is given one of three tiers, and its tier sets how closely it is checked and how often it is reviewed.
| Tier | A supplier is in this tier where | Reviewed |
|---|---|---|
| Tier 1 | It holds or can reach customer data, it can make changes to a system that [Company] uses to serve its customers, or [Company] could not serve its customers without it | At least every 12 months |
| Tier 2 | It holds or can reach [Company]'s confidential information, beyond the names and work contact details of the staff who use its service, or it has access to [Company]'s systems or accounts | At least every 24 months |
| Tier 3 | It is any other supplier that this policy covers | Only when section 8 calls for a review |
A supplier takes the first tier in the table whose test it meets. Its tier depends on what the supplier holds, reaches and does for [Company], and not on its size, its reputation or what [Company] pays it.
The CTO, or a person the CTO has named in writing, sets the tier of each supplier before it is approved, and the tier and the reason for it go in the supplier register. A supplier may be put in a stricter tier than the table gives it, and never in a less strict one. Tier 1 is the strictest tier.
A supplier's tier is set again whenever what it holds, reaches or does for [Company] changes. Where the change moves a supplier to a stricter tier, the checks that section 6 gives the new tier are made, the agreement meets what section 7 requires for it and the supplier is approved again under section 5, before the supplier is given the information or access that moved it.
4. The Supplier Register
[Company] keeps one supplier register, which lists every supplier that this policy covers. The CTO keeps the supplier register, and the entry for each supplier holds these twelve things.
- Supplier: the supplier's name and what it provides to [Company].
- Supplier owner: the member of staff responsible for [Company]'s use of the supplier.
- Tier: its tier under section 3 and the reason for it.
- Information and access: the kinds of information that the supplier holds or can reach, whether they include personal data, and which of [Company]'s systems and accounts it has access to.
- Approval: who approved the supplier under section 5, the day it was approved and any condition of the approval.
- Checks: what was looked at under section 6, the day it was looked at and what was found.
- Agreement: where the agreement that section 7 requires is kept, the day it ends or renews and the notice needed to end it.
- Reviews: the day of each review under section 8, what it found and, for a Tier 1 or Tier 2 supplier, the day the next review is due.
- Shortfalls: each shortfall under section 9, the date agreed for putting it right, any limit placed on the supplier until then and the day it was put right.
- Exceptions: any exception under section 10, with the requirement it covers, its reason, its conditions, its end date and who approved it.
- Leaving plan: for a Tier 1 supplier, the plan that section 6 requires.
- Ending: the day [Company]'s use of the supplier ended, the day the steps in section 11 were completed and any confirmation from the supplier that it has returned or deleted [Company]'s information.
The supplier register may be kept in any tool, provided that each entry holds these twelve things. A supplier is entered in the supplier register before it is approved, and the entry for a supplier that [Company] no longer uses stays in it.
5. Approving a New Supplier
No supplier is used for [Company]'s work, given [Company]'s information or given access to its systems or accounts until it has been approved under this section. This applies to a free service and to a service on trial as it does to one that [Company] pays for.
- The member of staff who wants [Company] to use a supplier asks the CTO for approval, and says what the supplier will provide, what information it will hold or be able to reach, whether that information includes personal data, what access to [Company]'s systems or accounts it will have and who its supplier owner will be. These go in the supplier's entry in the supplier register.
- The CTO, or a person the CTO has named in writing, sets the supplier's tier under section 3 and makes sure, before the supplier is approved, that the checks in section 6 have been made and that the agreement meets section 7, except where this section allows an approval for 30 days or section 10 allows an exception.
- The CTO approves each Tier 1 supplier in writing. A Tier 2 or Tier 3 supplier may be approved in writing by a person the CTO has named in writing instead. Each approval, with who gave it, the day it was given and any condition, goes in the supplier register.
- Nobody approves a supplier that they asked for. Where the CTO is the one who asks for a supplier, the CEO, or a person the CEO has named in writing, approves it instead.
- An approval covers the information and the access that the request describes. Before a supplier is given other information or other access, its supplier owner tells the CTO, and the supplier's tier is set again under section 3.
- Where [Company] needs a supplier before the checks in section 6 can be finished, the supplier may be approved for no longer than 30 days, on the condition that it is given no confidential information and no access to [Company]'s systems or accounts until the checks are finished and the agreement meets section 7. Where they are not finished within the 30 days, the use of the supplier stops until they are. A supplier that needs confidential information or access to [Company]'s systems or accounts before the checks are finished is used only under an exception approved under section 10.
- Where giving a supplier access to a system is a change under [Company]'s rules for change management, the access is given as those rules require.
- A supplier that [Company] was already using when this policy took effect, or that staff are found to be using without approval, is reported to the CTO, who decides whether its use stops until it has been approved. It is then put through this section as a new supplier is. Where the CTO decides that its use carries on, the supplier is treated as approved under this section, for the information and the access it already has, until it has been put through this section, and that decision and the day it was made go in the supplier register.
6. Checks Before Approval
The member of staff who will be a supplier's supplier owner makes the checks below. They are made before the supplier is approved, or within the 30 days for which section 5 lets a supplier be approved before they are finished. What was looked at, the day it was looked at and what was found go in the supplier register.
- For every supplier, the check confirms what the supplier will provide, what information it will hold or be able to reach and what access it will have.
- For a Tier 1 or Tier 2 supplier, the check looks at evidence of how the supplier protects the information it holds. The evidence is a report or a certificate on the supplier's security from an independent body or, where the supplier has neither, the supplier's written answers to [Company]'s questions about its security.
- Where the evidence is a report or a certificate, the check confirms that it covers the service [Company] will use, that a report covers a period that ended no more than 12 months before the check, that a certificate has not expired, and what failings it records.
- For a Tier 1 or Tier 2 supplier, the check also confirms what the supplier's terms allow it to do with [Company]'s information for its own purposes, including whether it may use that information to train AI models, and which of the supplier's own suppliers will hold or be able to reach [Company]'s information.
- For a Tier 1 supplier, the check also confirms how and how soon the supplier tells [Company] of a security incident, and what the supplier commits to on keeping its service available and on restoring it after a failure.
- For a Tier 1 supplier, the member of staff who will be its supplier owner also writes a short plan for leaving it, which says how [Company] would get its information back and how it would carry on its work if the supplier failed or [Company] stopped using it. The plan goes in the supplier register.
- It is a shortfall where a Tier 1 or Tier 2 supplier gives none of this evidence, where the evidence does not cover the service [Company] will use or is out of date, where it records a serious failing that the supplier has not put right, or where the supplier's terms allow it to use [Company]'s confidential information for its own purposes.
- Where a check finds a shortfall, the supplier is approved, or stays approved after those 30 days, only after the shortfall is put right or has an exception under section 10.
- A report, a certificate or a set of answers is evidence of how a supplier works, and does not replace the reviews that section 8 requires.
7. Agreements with Suppliers
No supplier is given [Company]'s information or access to its systems or accounts before a written agreement with it is in place. Terms that a supplier publishes and [Company] accepts are a written agreement under this policy. The agreement with a Tier 1 or Tier 2 supplier must have these six terms.
- Confidentiality: the supplier keeps [Company]'s information confidential and uses it only to provide its service to [Company].
- Security: the supplier protects [Company]'s information with security measures that fit how sensitive it is.
- Incidents: the supplier tells [Company] promptly of any security incident that affects [Company]'s information.
- Its own suppliers: the supplier passes [Company]'s information to another supplier only on terms that protect it at least as well.
- Ending: the supplier returns or deletes [Company]'s information when the agreement ends.
- Evidence: the supplier gives [Company] the information it needs to check that these terms are met.
A term that is missing from the agreement with a Tier 1 or Tier 2 supplier is a shortfall under section 9, whether or not the supplier is willing to change its terms. The supplier owner records in the supplier register where the agreement is kept, the day it ends or renews and the notice needed to end it.
Where a supplier will hold or be able to reach personal data, the agreement also has the terms that [Company]'s rules on personal data require, and the supplier is given no personal data until the agreement has been confirmed as those rules require.
Where a supplier will hold or be able to reach customer data that [Company] holds under a contract with a customer, the CTO, or a person the CTO has named in writing, makes sure before the supplier is approved that the contract allows it, that the customer has been given any notice the contract requires, and that the agreement with the supplier protects that data at least as well as the contract does.
8. Reviewing Suppliers
- The supplier owner of a Tier 1 or Tier 2 supplier reviews it at least as often as the table in section 3 gives for its tier, counted from the day it was approved or last reviewed.
- A review looks at each security incident and each failure of the service since the last review, at whether the service has met what the supplier committed to, at whether the supplier holds and can reach only what the supplier register says, and at whether the agreement still meets section 7. A review of a Tier 1 or Tier 2 supplier also looks at fresh evidence of the kind that section 6 describes.
- The CTO, or a person the CTO has named in writing, confirms the result of each review. The day of the review, what it found and, for a Tier 1 or Tier 2 supplier, the day the next review is due go in the supplier register.
- A supplier in any tier is reviewed within 30 days, without waiting for its next review, when [Company] learns of any of these events: a security incident at the supplier that affects [Company]'s information or systems; a change in the supplier's terms, in who owns the supplier, in where it holds [Company]'s information or in which of its own suppliers hold that information; a new feature, such as an AI feature, that uses [Company]'s information in a new way; a report or a certificate that has expired or that records a serious failing; or repeated failures of the service.
- A supplier owner tells the CTO as soon as they learn of any of those events, or of a change in what the supplier holds, reaches or does for [Company].
- A security incident at a supplier that affects [Company]'s information or systems is also handled under [Company]'s incident response plan.
- At least every 12 months, the CTO makes sure that the supplier register is compared with [Company]'s payment records and with the services that staff sign in to, that every supplier found in use is on it, and that each entry still has the right tier and a supplier owner who works for [Company].
- Where a review finds a shortfall, section 9 applies.
9. Shortfalls
- Where a check or a review finds a shortfall, the supplier owner records it in the supplier register and asks the supplier to put it right by a date that the CTO, or a person the CTO has named in writing, agrees.
- The CTO, or a person the CTO has named in writing, decides whether [Company] limits the information or the access that the supplier has until the shortfall is put right. The date, any limit and the day the shortfall was put right go in the supplier register.
- Where the supplier does not put the shortfall right by that date, or will not, [Company] carries on using the supplier only under an exception approved under section 10. Without one, its use of the supplier ends under section 11.
- A shortfall at a Tier 1 supplier that is not put right by that date is recorded as a risk in [Company]'s risk register until it is put right or [Company] stops using the supplier.
10. Exceptions
An exception lets [Company] use a supplier, or carry on using one, while a requirement of this policy is not met. An exception does not put a shortfall right. It sets the conditions on which the supplier is used and the date by which the requirement must be met or the use of the supplier must end.
- A request for an exception gives the requirement that is not met, the reason, the conditions that will limit what the supplier holds or can reach, and the date on which the exception ends.
- The CTO approves each exception in writing. For a Tier 2 or Tier 3 supplier, a person the CTO has named in writing may approve it instead. Nobody approves an exception that they asked for, and where the CTO is the one who asks, the CEO, or a person the CEO has named in writing, approves it instead.
- An exception for a Tier 1 supplier also needs the written agreement of the CEO, or of a person the CEO has named in writing.
- An exception lasts no longer than 12 months. It is renewed only in the same way, and the request to renew it says why the requirement is still not met.
- An exception never lets a supplier be given [Company]'s information, or access to its systems or accounts, without a written agreement, and never sets aside a term that a law, or a contract of [Company]'s, requires its agreement with a supplier to have.
- Each exception goes in the supplier register with the requirement it covers, its reason, its conditions, its end date and who approved it. When an exception ends and the requirement is still not met, [Company]'s use of the supplier ends under section 11.
11. Ending the Use of a Supplier
When [Company] stops using a supplier, its supplier owner makes sure the steps below are carried out.
- The supplier owner tells the CTO before the use ends, or as soon as it has ended where it ends without warning.
- [Company] takes a copy of any of its information that it still needs from the supplier, in a form it can use, before its access to the supplier's service ends.
- Every account that staff hold with the supplier is closed, and every account, key and connection that gives the supplier or its service access to [Company]'s systems or accounts is removed.
- The supplier is asked to return or delete [Company]'s information as the agreement requires. For a Tier 1 or Tier 2 supplier, the supplier owner asks the supplier to confirm in writing that it has done so.
- The CTO, or a person the CTO has named in writing, confirms within 30 days of the day the use ended that these steps are complete. The day the use ended, the day the steps were completed and any confirmation from the supplier go in the supplier register.
- Where a security incident or a serious failing at a supplier means that [Company] cannot wait, the CTO may have the supplier's access removed at once, before the supplier is told.
12. Records, Reporting, Breaches and Review
[Company] keeps each entry in the supplier register, and the evidence looked at in each check and review, for at least 3 years after its use of the supplier ends.
At least every 12 months, the CTO reports to the CEO the number of suppliers in each tier, the reviews that are overdue, the shortfalls that have not been put right and each exception in force.
Using a supplier for [Company]'s work without approval under section 5, giving a supplier information or access that its approval does not cover, or writing in the supplier register something that the person writing it knows to be untrue, is a breach of this policy. A breach may lead to disciplinary action up to dismissal, in line with [Company]'s disciplinary process and the employment law of the country where the person works; for contractors and other non-employees it may lead to the engagement ending. Nobody is penalized for reporting, in good faith, a supplier that is being used without approval or a requirement of this policy that has not been met.
The CTO reviews this policy at least every 12 months and after any significant change to [Company]'s systems, suppliers or ways of working, and each change to this policy is approved by the CEO.
Disclaimer
This document is provided for informational purposes only and does not constitute legal advice. It is provided "as is", without warranty of any kind, express or implied, and no liability is accepted for any loss or damage arising from its use. It is used at your own discretion. Review it with a qualified adviser before adopting it.